DESCRIPTION
Provides a screen to reduce the risk of debris falling outside the chute as it is deposited at the top of the chute. Inserts into the top of a standard rubbish chute section.
IMAGE

DESCRIPTION
For depositing rubbish into a chute at intermediate levels. Provides a screened opening part way down.
IMAGE

DESCRIPTION
Steel chain and attachment connects to other chute sections and fixing frame.
IMAGE

DESCRIPTION
Connects 1m chute section to scaffolding using a separate pair of scaffold double couplers.
IMAGE

DESCRIPTION
Easy stacking one-piece plastic brick guards with integrated guard-rail clip and toe-board clip. Black brick guards are made from recycled plastic, which is more environmentally sustainable. Other colours are available, including those unique to your company.
IMAGE

DESCRIPTION
Manufactured from high density polyethylene monofilaments which allows air to pass through, reducing wind loading compared with scaffold sheeting. Designed to provide some protection for adjacent areas from wind-blown dust and debris. Colours green, blue, yellow, black and white. 50m x 2m, or 50m x 3m rolls.
IMAGE

DESCRIPTION
Plastic Sheeting for weather protection and containment on scaffolds. Clear reinforced low density polyethylene with 2300 reinforcement denier polypropylene spaced 9mm x 9mm. 14cm reinforced eyeletted strip along edges and 7cm down centre. Light transmission up to 70%. Fire retardancy an option. Rolls of 50m x 2m or 3m.
IMAGE

DESCRIPTION
Used to secure cladding to scaffold. Toggle, or ‘bungie’ ties are elasticated cords that stretch from 20.5cm to 46cm, with plastic hooks at each end to form a quick-release loop. They fit through the eyelets in the plastic sheeting.
IMAGE
